Planning for the closed spreading period

684x384_Nitrates.png

Slurry, farmyard manure and chemical fertilisers are prohibited from being spread over the winter period to comply with the Nitrates Directive and deadline are now fast approaching:

  • 15th of September for chemical fertilisers,

  • 15th of October for Organic manures

  • 1st of November for farm yard manure.

 

The reasoning behind the closed period is to protect ground and surface water quality including drinking water and to ensure the efficient use of nutrients. This period of time represents the time when the risk of nutrient leaching is at its highest and there is little or no plant growth to take up and utilise the nutrients.

Now is a good time to assess slurry storage capacity for the coming winter on the farm, it’s important that you check around the farmyard to ensure that the most is being made from the available storage, the best use of nutrients in slurry and manures will be achieved by applying during the growing season and this is why it’s important to act now while we still have active growth to ensure that all tanks are empty and storage capacity is maximised as the winter approaches, target fields that are low in P and K with any slurry.

Examine the rainwater that is coming off roofs and clean concrete areas and if this is entering slurry tanks it will be using valuable slurry storage space so ensure that this is not the case and that it is diverted elsewhere. Check that all gutters and downpipes are working efficiently and carry out repairs where necessary. Ensure that as much of the farmyard as possible is free from livestock access and manure, as this will significantly reduce the volume of dirty water or slurry to be collected.

It’s important to remember to only spread slurry when conditions are suitable and avoid applications on steep slopes where a risk of water pollution may exist. Remember Buffer zones along rivers, streams and drains increase from 5m to 10m two weeks prior to the closing period for organic manures (15th October)

Storage periods for cattle manure & the prohibited periods for spreading fertilisers to land.

First Published on 15 September 2020

Tagged with: Dairy

Processing